EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sportsman
-
Listing for Category : Final (X)
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (661)
Rudder (III)
- (1)
Horiz S (IV)
- (11)
Elevator (V)
- (32)
Wing LH (VI)
- (107)
Wing RH (VI)
- (82)
Aileron(VII)
- (38)
Flaps (VII)
- (32)
Fuselage (VIII)
- (67)
Systems (IX)
- (113)
Avionics
- (13)
Engine
- (1)
Inspection
- (2)
Interior Finish
Lighting
- (1)
Paint / Decals
- (5)
Propeller
- (1)
Kit INVTRY
- (5)
Research
- (6)
Tools
- (1)
Workshop
- (13)
Wings
Final (X)
- (126)
FWF (X)
- (2)
Phase 1
- (2)
Builder Name:
Kyle Stone
-
Project:
Glasair - Sportsman 2+2
-
VIEW REPORTS
Total Hours:
1859.9
Start/Last Date:
Jul 03, 2019 - Jun 30, 2022
Engine:
Lycoming IO-390-EXP
Panel:
Garmin G3X w/ GNX375 IFR nav, GNC 255 NAV/COM
Friendly URL:
https://eaabuilderslog.org?s=Sportsman
Home or Last Project Picture
Feb 21, 2021
Baffling install
- (3 hours)
Category: Final (X)
Finished u Garlock trimming and install with both LWR and UP Cowlings. Still need to tweak the LH plenum Garlock just a little but its 98% done! I am missing the Magneto ports and tubing....I'll see if I can add those to the order from GA prior to it shipping this week. Even though I am not using traditional Magnetos, I still need cooling tubes based on the installation instructions from E-Mag
81A18F0C-07EE-4AB6-BE82-94E12BB9F627.jpeg
88F12F68-D6EC-4D9E-9758-381AFB00E17D.jpeg
D773F070-C7D9-49E7-BDBC-E17944E1577D.jpeg
8A1642BB-FCDA-47E0-8B53-4151E55EBB66.jpeg
16CAAE49-85D6-48F8-98EB-7BC363E1B060.jpeg
FB99D5B9-B023-4462-B013-A1CDFDE90009.jpeg
59911386-8DB0-4F2E-916D-06D1CFD3A53C.jpeg
4F766C92-7F81-4DF9-BBE4-8810D902B4CD.jpeg
72ECCAF9-1228-4321-B5B4-A463E62DCD29.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.